| |
|
 |
 |
| |
| |
- Main Sewage Pump Station-El-Dekehela, Alexandria (D=20m, h=30m)
- Study the claims between International dredging company and Port SaeedHarbour during dredging East Port Saeed Channel
- Study the claims between Construction Company and Alexandria University
- Planning, design 2nd Phase of Mukalla Channel
- Design earth retaining structure for underground and basement up to 9.0mm depth below ground surface
- Design enormous dewatering system for building construction.
- About 700 geotechnical soil investigation and foundation reports have been issued per year
- Rehabilitation of Faculty of Engineering building, Farous University, Alexandria
- Extension units of Alexandria Oil Refinery
- Extension units of El-Ameria Oil Refinery
- Oil pipe line from El-Ameria oil refinery to Alexandria Sea Port
- Design of cover and cut tunnel at Alexandria, including dewatering system
- Ministry of Interior building in Alexandria
- Two schools in Alexandria
- Stadium at Alexandria
- New SidiGaber multi-storey garage.
- Potable water pipe line from Manshia water Treatment plant to Alexandria city center of length about 4 km.
- Strategic storage water tanks at Matrouh.
|
|
|
|
|
|
|
|
|
|